The 5 Infrastructure Filters Every Data Center Site Must Pass
In high-stakes infrastructure development, site selection is everything. One wrong decision can add millions in cost or delay a project by years. That’s why at FrontierGen, we apply a rigorous 5-point filter to every land parcel. If a site doesn’t pass all five, it’s off the table.
Here’s what those filters are—and why every one of them matters.
1. Electricity Readiness
A great site starts with a great substation. We require high-voltage (138kV or greater) access, flexible interties, and a supportive utility partner. Without this, you’re stuck in the interconnection queue.
2. Gas Infrastructure
Proximity to high-pressure natural gas trunklines is critical for on-site generation. If gas isn’t accessible—or regulated too tightly—your backup power plans fall apart.
3. Water Access
Cooling systems need reliable, low-cost water. Whether it’s surface rights, wells, or reclaimed sources, we verify the volume, cost, and legality of every drop.
4. Fiber Connectivity
Carrier-grade fiber isn’t optional. Our sites include dual-diverse fiber routes, access to multiple providers, and proximity to peering points for low latency.
5. Regulatory Flexibility
A perfect parcel can still fail if it’s inside a restrictive jurisdiction. We seek land outside city limits but within favorable legal venues like Texas’s South and North Federal Districts—ensuring smoother permitting and development.
Conclusion
Any developer can find land. But finding the right land—where all five infrastructure pillars align—is rare. That’s what makes FrontierGen different. We only surface land that passes every test so you can build faster, safer, and smarter.